Highways England’s Plans

Highways England are the Government body that is tasked with looking after the strategic roads network and in this instance, expanding the A27 around Arundel.  It has now said that it is going to re-consult about the options for expanding the A27 in the Spring of 2019, but it doesn’t appear to be looking at less damaging options.

This is Highways England’s preferred route announcement made on 11 May, 2018

A27_Arundel_Bypass_PRA_Brochure_-_Web_Version_-Final_-_100518

It has written the following letter to residents, outlining the timetable for the scheme:

HE-letter-to-residents-feb17

Letter sent to Arundel residents – February 2017

Below is a report from a very poor ‘stakeholder’ meeting held in Walberton in July 2015 along with the draft objectives drawn up by Highways England:

A27-Objectives-Arundel

Draft objectives

55123_A27A_Report_V1.4_StkhWks

July 2015 meeting report